BauBots from Fischer master Engelberg tunnel renovation 9,000 drill holes, set with millimeter precision - and that at over seven meters high. What used to be manual work is now done by smart robots. In the Engelberg tunnel, it is evident how Fischer BauBots are redefining the future of the infrastructure sector.